Introduction
Bondtech's Product Page
This Guide relates to this Direct Drive System for Creality CR-10S Upgrade Kit:
https://www.bondtech.se/en/product/bondt...
Strip down your CR-10S before the installation
Before installing this DDS for CR-10S Gen I upgrade, check the "02. Stripping Down Your Creality CR-10S" step by step guide.
Download The Firmware after the installation
After completing this installation don't forget to update the firmware. You can download it by visiting the '''Creality Firmware Page'''.
You will need :
IMPORTANT NOTE
Please take close attention we do not mention power tools in the list of tools below.
We do not recommend power tools to install the DDS.
Using excessive torque when screwing screws into threaded metal inserts can cause damages to the PA12 housing. It’s metal against plastic. Metal wins.
Tools
Parts
No parts specified.
-
-
Hold the stepper motor.
-
Use the 2.5 Hex Key to unscrew 3 M3x30 screws from the housing until the motor comes loose.
-
-
-
Use the 2.5 Hex Key to push the 3 M3x30 top screws from the back.
-
Use the same Hex Key to untighten the other 2 M3x30 screws at the front.
-
-
-
Place the M3x10 screw in the left hole and use the 2.5 Hex Key to attach it. Don't tighten it much.
-
-
-
Place the 2 M3x6 Countersunk Screws and 2x M3 Washer in the bottom central holes. Use the 2.0 Hex key to tighten them. Don't tighten much.
-
-
-
The housing will not be fixed at this point. Check the slack but turn the housing to left or right until you see it align with the vertical.
-
Use the 2.0 Hex Key to tighten the 2 M3x6 Countersunk Screws.
-
Use the 2.5 Hex Key to tighten the M3x10 screw on the left.
-
-
-
Rotate the front housing back into place.
-
Use the 2.5 Hex Key to attach the front housing.
-
-
-
Use the 2.5 Hex Key to finish attach the front housing with the 2 M3x30 screws.
-
-
-
Place the fan shroud in place as show in the video.
-
Use the 2.5 Hex Key to tighten the M3x8 screw on the right.
-
Use the 2.5 Hex Key to tighten the M3x8 screw on the left.
-
-
-
Take the fan and place it aligned with the holes in the front housing.
-
Insert the M3x8 screws tightening them a bit by hand, so the fan doesn't fall down.
-
Use the 2.5 Hex Key to tighten the fan into place.
-
-
-
Insert the 2 M3x16 screws in the side holes near the fan.
-
Use the 2.5 Hex Key to tighten the screws.
-
-
-
Align the stepper motor shaft with the hole below the white main gear.
-
Plug the connector into the motor.
-
-
-
Insert the M3x30 screws in the holes around Bondtech logo.
-
Use the 2.5 Hex Key to slightly tighten the screws.
-
-
-
Use the 2.5 Hex Key to tighten the screws, one by one.
-
-
-
Use your fingers or a 2.0 Hex Key to place the cabling into the guide groove on the bottom right of the extrusion system.
-
-
-
Take the thumb screw and insert it in the hole of the hinge until you feel it tight.
-
-
-
Insert the PTFE tube into the push fit at the top of the extrusion system.
-
Grab the power cable with the cable clamps
-
Attach the PTFE tube to the power cable using the cable clamps.
-
-
-
Use the 2.0 Hex Key to remove the 2 screws of the old filament sensor housing
-
Remove the cover and sensor from inside.
-
Remove the cover from the Bondtech filament sensor housing
-
Place the sensor inside with the PCB facing up and the connector facing out.
-
Put the cover back and tighten the screws.
-
-
-
Attach the Filament Sensor Assembly to the 2 left shafts holding the metal plate of the X axis stepper motor.
-
Anchor it on the bottom shaft
-
Snap it over the top shaft.
-
Fit the power cable on the posterior groove.
-
Fit the PTFE tube into the push fit.
-
-
-
Conect the mic plug to the top mic socket on the back of the control box.
-
You may now proceed to install the updated firmware we supply.
Don't forget to do a bed leveling before you use the new extrusion system.
You may now proceed to install the updated firmware we supply.
Don't forget to do a bed leveling before you use the new extrusion system.